Know the ground. Prove the progress.

Drone survey and monitoring for contractors, developers and owner’s representatives across Vancouver Island. Pre-construction topography, earthworks quantities that support a claim, and a dated monthly record of what actually happened on site.

Three problems, one aircraft

Construction clients come to us with three recurring problems. The first is not knowing the ground well enough before design: an existing-conditions survey that is old, coarse or absent, which turns earthworks estimating into guesswork. The second is quantities: how much material moved this period, and can it be proved. The third is chronology: establishing what was built when, and in what condition, once somebody starts asking.

All three are answered by the same capability. A pre-construction flight gives you the base surface. Repeat flights against it give you volume movement per period. And the imagery from those flights, dated and positioned, is the record that answers the third question years later.

The one thing worth booking early

Fly the site before mobilisation. It costs the same as flying it in month three and it is worth considerably more, because every quantity afterwards is measured against a real surface rather than an assumed one. This is the single most common thing clients wish they had done.

The same development site photographed from an identical aerial position weeks apart, graded pads in the first frame and framed structures in the second
Controlled airspace. Much of the active ground in Greater Victoria and Nanaimo sits inside a control zone. We hold Advanced Operations certification and obtain the NAV CANADA authorisation as part of the job.
Applications

What we fly for construction clients

Pre-construction topographic survey

Existing conditions before design or mobilisation: orthomosaic, surface model and contours at the interval your civil engineer specified, in the project coordinate system. Topographic survey.

Earthworks quantities and progress claims

Cut, fill and net movement between dated surfaces, per claim period. Turns a negotiation into an arithmetic check. Volumetric survey.

Monthly progress records

Identical repeat flights producing comparable imagery and surfaces, for owner reporting, lender draws and dispute documentation. Progress monitoring.

As-built verification

Measured comparison of constructed work against design surface, identifying where the built condition departs from the drawing before it is buried.

Roof, envelope and structure inspection

Close-range condition capture during construction and at handover, on surfaces nobody wants to access twice. Aerial inspections.

Marketing and stakeholder imagery

Development imagery for sales, consultation and permitting, flown on the same attendance as the survey work. Aerial media.

Get your site flown Fly it before mobilisation if you can. Every earthworks quantity afterwards is measured against that surface rather than an assumption.
Who commissions it

Different buyer, different reason

General contractors

Quantities for progress claims, a defensible record against delay and variation arguments, and monthly imagery that goes into an owner report without editing. The claim application is usually where the value first shows up.

Developers and owners

Independent verification of progress and quantities, imagery for lender draws and marketing, and pre-construction survey to inform feasibility before committing to a design.

Civil engineers and consultants

Existing-conditions surfaces delivered into Civil 3D or LandXML, on a turnaround that fits a design programme. Frequently a subcontract arrangement rather than a client relationship. Data and GIS deliverables.

Deliverables

Into the software you already use

DeliverableFormatGoes into
Existing-ground surfaceLandXML / DXF / TINCivil 3D, 12d, Trimble Business Center
ContoursDXFAny CAD package
OrthomosaicGeoTIFF + PDFCAD base layer, reports, presentations
Volume reportPDF + CSVClaim applications, cost reporting
Point cloudLAS / LAZ / RCPRecap, Civil 3D, clash review
Progress image setJPEG, indexedOwner reports, dispute files
Method & accuracy notePDFProject quality file
Compliance & insurance

What your procurement team will ask for

We fly under a Transport Canada Advanced Operations certificate with licensed pilots, which is the level required to operate in controlled airspace and near people. Airspace authorisations are obtained before mobilisation, and the airframe carries a certified parachute for work near occupied areas.

We carry $5M in aviation liability insurance and a certificate is available on request for your project file. WorkSafeBC clearance is available, site safety orientation is completed on arrival, and we work to the host contractor's requirements.

  • Transport Canada Advanced Operations certificate
  • Licensed pilots, current flight reviews
  • $5M aviation liability insurance
  • WorkSafeBC clearance letter available
  • Certified parachute for operations near people
  • Airspace authorisation handled by us
  • Written method note on every job
Where we fly

Active development on the Island

Langford & the Westshore

The densest concentration of active residential and commercial construction on the Island.

Victoria & Saanich

Infill, institutional and municipal capital work, largely inside YYJ controlled airspace.

Nanaimo

Industrial, port and commercial development on the central Island.

Questions

Construction survey, answered

When in the project should we start flying?

Before mobilisation, ideally. A pre-construction survey captures existing conditions while they are still existing, which gives you a base surface for every earthworks quantity afterwards and a dated record of what the site looked like before anyone touched it. Starting after work begins means every volume from then on is measured against an assumed base rather than a measured one, and the difference shows up in the first claim dispute.

Can drone data settle a quantity dispute?

It can settle the measurement part of one. Two dated surfaces produce a volume difference that is arithmetic rather than opinion, and that removes the argument about how much material moved. What it cannot settle is entitlement — whether the movement was in scope, who authorised it, what it is worth. That is a contractual question. What we supply is the number both sides can agree on.

Do you work for the contractor or the owner?

Both, and we say plainly which on any given project. Contractors typically commission monitoring for claims and progress reporting. Owners and their representatives commission it for independent verification. We do not act for both parties on the same project without both knowing.

How does this fit with our surveyor?

It usually supplements rather than replaces them. Aerial survey is efficient at surfaces and volumes across a whole site; a ground crew is better at specific features, set-out, and anything requiring a professional seal. Several of our construction clients use us for the surface and their surveyor for the detail, which is a cheaper combination than using either for everything.

Is the site disrupted?

Very little. A monitoring flight is a two to four hour attendance, we coordinate exclusion zones with the site supervisor, and we fly around plant movement rather than requiring it to stop. Our Advanced Operations certification and the parachute-equipped airframe are what allow flight over an occupied site at all.

What about a site next to the airport?

Much of the commercially active ground in Greater Victoria and around Nanaimo sits in controlled airspace, and flight there requires Advanced certification plus a NAV CANADA authorisation. We handle that authorisation as part of the job. An operator without Advanced certification either cannot fly your site or is flying it without the clearance they need, and that becomes your exposure rather than theirs.

Next step

Tell us about the site

Location, rough area, what the data is for and your timeline. That is usually enough to quote without a site visit, and our team typically replies within one business day.